How Long Should Your Renovation Actually Take?
20 Oct 2026 · 2 min read
Budgeting & Process Transparency
20 Oct 2026 · 2 min read

A typical HDB renovation runs 9 to 10 weeks from the day hacking starts to handover. A condo of similar scope often lands in the same range; a full resale unit with more extensive works, or a landed property, can run longer. Any quote that promises a dramatically shorter timeline for the same scope is worth questioning, not celebrating.
Design, material selection and the permit application happen before day one and aren't part of the on-site weeks at all. Once work starts: protection and hacking in the first week or two, wet works and electrical rough-in through the middle stretch, then carpentry installation, painting and flooring toward the end, with a final week for cleaning and defect checks before handover. Carpentry is usually being fabricated in the workshop in parallel with on-site work, which is part of why keeping design and carpentry in-house keeps the schedule realistic rather than sequential.
Late decisions on materials, scope changes introduced mid-project, and permit delays are the three things that reliably push a renovation past its planned weeks. The construction itself is not what causes the delay. A firm that commits to a specific week-by-week schedule at the design proposal stage, and sticks to it, is doing the hard part before the visible part ever starts.
Tell us your property type, scope and rough budget. We reply within one working day.
Request a design proposal